Feedback Requests
Complete

Phase 7.3 — Preparation

The unglamorous groundwork that makes the rest routine.

Clock synchronisation configured where it was never set, three degraded network links repaired, name resolution moved onto a dedicated resolver, installer media staged, and an automation control node built so the new servers are configured from version-controlled code rather than by hand.

No downtime.

0 Comments

Sign in to comment

No comments yet. Be the first to share your thoughts!