Changelog

7.4.0.1 — August 2026

Phases

  • Phase 7.3 — Preparation is complete.
  • Phase 7.4 — Storage burn-in is complete; the replacement disks for the last array arrive shortly, so this subphase stays open.

Stability

  • Retrofitted the platform's storage onto disks proven by a full surface, soak and SMART burn-in before any data was placed on them.

Tracks in this release: Phases · Stability

Shipped Features